The images below show the daily progress (23rd June 2014) of model for Experiment 3. 



The first image is a continuation from yesterday's conclusion. 


The second image is a realistic view from a seat in the lecture theatre. Colour and textures have been applied to the theatre. The plan is to have the remaining furniture placed at the end to avoid lag issues.


The third image is a section showing the bottom, mezzanine and top floor of the university (where the top floor is the library, the mezzanine space contains study rooms and the bottom floor consists of offices and meeting rooms for general staff).



Final screenshot shows a plan sectional view of the final progress for the day.